Cold and hot shock test chamber maintenance method

1. The condenser (or radiator) of the refrigeration unit in the cold and heat shock test chamber should be regularly maintained to ensure it remains clean. Dust that adheres to the condenser can cause the compressor's high-pressure switch to trip, leading to false alarms. The condenser should be cleaned monthly using a vacuum cleaner to remove dust from the condenser's cooling mesh, or after turning on the machine, use a hard-bristled brush to clean it, or blow away the dust with a high-pressure air nozzle.

2. When opening or closing the door or taking the test object from the furnace, do not let the item touch the rubber edge on the door to prevent the rubber edge from being damaged and shortened life.

3. Keep the ground around and under the fuselage clean at all times to avoid accidents and performance degradation caused by large amounts of dust being sucked into the unit.

4. The freezing system of the cold and hot shock test chamber is the core of this machine. Please inspect all copper tubes for leakage and snow conditions every half a year, as well as all nozzles and welding joints. If there is oil leakage, please inform the company or deal with it directly.

5. The large current contact of the distribution panel should be cleaned and repaired at least once a year in the distribution room. The loosening of the contact will make the whole equipment work in a risky state. At best, it will burn out the components, and at worst, it will cause fire, alarm and personal injury. When cleaning, use a vacuum cleaner to remove the dust in the room.

6. Do not adjust the setting value of the two over-temperature protectors in the power distribution box of the cold and hot shock test chamber casually. It has been adjusted at the factory. This protective switch is used to protect the heating tube from empty burning and alarm. The setting point = temperature setting point 20℃~30℃.

7. Cold and hot shock test chamber When the test product is taken when the time arrives, it must be in the off state and the staff must wear dry, anti-electricity and temperature-resistant gloves to take and put the product.

8. Clean and maintain the inside and outside of the cold and heat shock test chamber. 9. Before operating the cold and heat shock test chamber, remove any internal impurities. 10. The electrical distribution room should be cleaned at least once a year. When cleaning, use a vacuum cleaner to remove dust. The exterior of the chamber must be cleaned at least once a year, using soapy water for wiping.

 environmental test equipment manufacturers

阅读全文......

Requirements for the installation of the water spray test chamber

This device differs from ordinary equipment, so the installation site must meet the following special requirements:

  1. The site must have ample space for the test equipment and sufficient maintenance area.
  2. The laboratory should be equipped with a water supply system.
  3.  The installation site should have ideal drainage facilities, such as ditches and outlets.
  4. The power supply for the device should have a good grounding system and a waterproof base and cover to prevent electrical leakage or electric shock due to water splashing onto the power source.
  5. The height of the installation site should allow the device to operate normally and facilitate future maintenance and repairs after installation.
  6. The annual temperature at the installation site should be maintained between 5-32℃, with a relative humidity not exceeding 85%, and there should be adequate ventilation.
  7. The installation should be in a dust-free environment.
  8.  The environmental temperature at the installation site should avoid sudden changes.
  9. The installation should be on a level surface (using a level to ensure it is level).
  10. The installation should be in a location away from direct sunlight.
  11.  The installation should be far from flammable materials, explosive materials, and high-temperature heat sources.
  12.  It is best not to install other equipment in the laboratory to prevent moisture-induced corrosion.
  13. Water source: municipal tap water。   