Delivery Standards for Lab Companion Products

Key Considerations for Equipment Handover to Ensure Proper On-Site Operation:

1. Equipment Installation and Commissioning

Our company oversees the transportation and electrical connection of the equipment, ensuring proper operation at the customer's site. All installations strictly comply with the standard acceptance criteria for environmental test chambers. We conduct regular third-party inspections to guarantee continuous adherence to industry standards. Should the customer require an inspection report upon acceptance, we can arrange for an accredited third-party agency to perform on-site testing.

 

2. Customer Technical Training System

2.1 Basic Operation Training

The training covers equipment startup/shutdown procedures, test program configuration, and routine maintenance protocols. Depending on the user's industry (e.g., third-party testing institutions, automotive manufacturers), the training program is customized to align with specific operational scenarios.

 

2.2 Advanced Maintenance Training

This program focuses on developing users' troubleshooting and repair capabilities, including humidity system failure diagnosis in temperature-humidity test chambers. Training includes key component replacement procedures and precautions to establish an independent maintenance competency system.

 

                                                                   On-site Chamber Repair Photos

 

3. Technical Support Service Protocol

3.1 Emergency Response Mechanism

A standardized fault response process ensures technical support is initiated within 2 hours of receiving a service request. Common faults are resolved within 48 hours (with alternative solutions negotiated for remote regions).

 

3.2 Remote Technical Support

Equipped with a professional remote diagnostic system, real-time video communication or dedicated software access enables rapid fault identification.

 

4. Spare Parts Supply and Maintenance Assurance

4.1 Spare Parts Management Plan

To enhance after-sales support, we establish dedicated spare parts warehouses for high-volume buyers and repeat clients, enabling rapid response to service needs. Each customer is assigned a dedicated profile to optimize resource allocation.

Priority supply channels are reserved for key partners (e.g., CRCC, CETC), ensuring expedited spare parts delivery to minimize equipment downtime.

 

4.2 Maintenance Service Policy

Free repairs are provided for non-human-induced failures during the warranty period. Post-warranty maintenance services follow a transparent pricing system, with detailed repair plans and cost estimates provided in advance.

Our company maintains a professional after-sales maintenance team and is committed to continuously improving the technical expertise of our service personnel. We anticipate being able to provide on-site support for international customers in the near future.

阅读全文......

Maintenance methods for constant temperature and humidity test chambers

1. Dust adhering to the condenser can cause the high-pressure switch of the compressor to trip and issue false alarms. Therefore, dust attached to the cooling grid of the condenser can be removed with a vacuum cleaner every month, or by using a hard-bristled brush after turning on the machine, or by blowing it off with a high-pressure air nozzle.
2. The area around the machine and the ground at the bottom should be kept clean at all times to prevent a large amount of dust from being sucked into the unit or reducing equipment performance and causing accidents.
3. When opening or closing the door or taking samples from the test chamber, do not touch the sealing strip on the door.
4. The core of the constant temperature and humidity test chamber - the refrigeration system should be inspected once a year. Check for leaks in the copper tubes and at each joint and interface. If there are any, inform the manufacturer.
5. The humidifier and water tank should be cleaned frequently to avoid scaling and affecting steam emission. Clean them after each test. Timely descaling helps extend the lifespan of the humidification tube and ensures smooth water flow. When cleaning, use a copper brush and then rinse with water.
6. The distribution room should be cleaned and inspected more than once a year. Loose nodes can put the entire equipment in a dangerous working state, burn out components, cause fires, alarms, and endanger lives.
7. The dry and wet bulb wicks should be checked frequently. Replace them promptly if they become hard or dirty. It is recommended to replace them every three months.
8. Inspection and maintenance of the water circuit. The water pipes in the water circuit are prone to clogging and leakage. Regularly check for leaks or blockages. If found, remove them promptly or notify the manufacturer.

阅读全文......

Selection of the installation site of the rapid temperature change test chambe

Selection of the installation site of the rapid temperature change test chamber:

  1. The distance from the adjacent wall can smoothly give full play to the role and characteristics of the environmental test chamber. The long-term temperature of 15 ~ 45 °C and the relative environmental humidity exceeding 86% should be selected. site.
  2. The working temperature of the installation site must not change significantly.
  3.  It should be installed on a leveling surface (use a level to determine the level on the road during installation).
  4. It should be installed in a site without sun exposure.
  5.  It should be installed in a site with excellent natural ventilation.
  6. It should be installed in areas where flammable materials, explosive products and high-temperature heat sources are eliminated.
  7. It should be installed in a site with less dust.
  8. Install it as close as possible to the switching power supply of the power supply system.Selection of the installation site of the rapid temperature change test chambe
阅读全文......

What are the delivery standards of Lab Companion?

(1) Equipment installation and commissioning

On-site service: technical personnel will deliver the goods free of charge and complete the mechanical assembly, electrical wiring and debugging. The debugging parameters shall meet the temperature and humidity, salt spray deposition amount and other indicators in the customer's technical agreement.

Acceptance criteria: provide a third-party measurement report, and unqualified equipment shall be returned or replaced directly. For example, the rain test box shall pass 100% acceptance.

(2) Customer training system

Operation training: covers equipment start and stop, program setting and daily maintenance, customized for different user scenarios such as quality inspection institutions and automobile enterprises.

Deep maintenance training: including fault diagnosis (such as troubleshooting of humidity system in high and low temperature and humidity test chamber) and spare parts replacement to improve customers' independent maintenance ability.

(3) Technical support and response

Instant response: respond to repair demand within 15 minutes, and solve routine faults within 48 hours (negotiate with remote areas).

Remote diagnosis: through video guidance or remote access software, quickly locate the problem (such as abnormal dust concentration in the sand test chamber).

(4) Spare parts supply and maintenance

Make spare parts plan, give priority to the supply of wear and tear parts from cooperative units (such as China Railway Inspection and Certification Center, China Electronics Technology Group), and reduce downtime.

Non-manual damage is free of charge during the warranty period, and paid services are provided after the warranty period with transparent charges.

the delivery standards of Guangdong Hongzhan

阅读全文......

What should I do if the high and low temperature test chamber has problems?

High and low temperature test chamber may encounter a variety of problems in the process of use, the following is a summary of potential faults and their causes from different perspectives:

1. Core system failure

Temperature out of control

Reason: PID control parameters are out of balance, ambient temperature exceeds the design range of the equipment, multi-zone temperature interference.

Case: In a special environment workshop, the external high temperature causes the refrigeration system to overload, resulting in temperature drift.

Humidity is abnormal

Reason: poor water quality of humidification leads to scaling and nozzle blockage, failure of ultrasonic humidifier piezoelectric sheet, and incomplete regeneration of dehumidification desiccant.

Special phenomenon: reverse condensation occurs during high humidity test, resulting in the actual humidity in the box being lower than the set value.

2. Mechanical and structural problems

Air flow is disorganized

Performance: There is a temperature gradient of more than 3℃ in the sample area.

Root cause: the customized sample rack changed the original design air duct and the accumulation of dirt on the centrifugal fan blade led to the destruction of dynamic balance.

 sealing failure

New failure: the magnetic force of electromagnetic sealing door decreases at low temperature, and the silicone sealing strip becomes brittle and cracks after-70℃.

3. Electrical and control system

Intelligent control failure

Software level: After firmware upgrade, the temperature dead zone setting error occurs and the historical data overflow causes the program to crash.

Hardware level: SSR solid state relay breakdown causes continuous heating and bus communication is subjected to inverter electromagnetic interference.

Security protection vulnerabilities

Hidden dangers: the synchronous failure of the triple temperature protection relay and the false alarm caused by the expiration of the refrigerant detector calibration.

4. Challenges of special working conditions

Specific temperature shock

Problem: -40℃ to +150℃ rapid conversion of the evaporator weld stress cracking, thermal expansion coefficient difference resulting in the failure of the observation window seal.

Long-term operation attenuation

Performance degradation: after 2000 hours of continuous operation, the compressor valve plate wear leads to a decrease of 15% in refrigeration capacity and drift of ceramic heating tube resistance value.

5. Environmental and maintenance impact

Infrastructure adaptation

Case: The power oscillation of PTC heater caused by the fluctuation of power supply voltage and the water hammer effect of cooling water system damaged the plate heat exchanger.

Preventive maintenance blind spots

Lesson: Ignoring the positive pressure of the box leads to water entering the bearing chamber and biofilm growth and blockage in the condensate discharge pipe.

6. Pain points of emerging technologies

New refrigerant application

Challenges: system oil compatibility problems after R448A replaces R404A, and high pressure sealing problems of subcritical CO₂ refrigeration systems.

IoT integration risks

Fault: The remote control protocol is maliciously attacked, resulting in program tampering and cloud storage failure, resulting in the loss of test evidence chain.

Strategy recommendations

Intelligent diagnosis: configure vibration analyzer to predict the failure of compressor bearing, and use infrared thermal imager to scan the electrical connection points regularly.

Reliability design: key components such as evaporator are made of SUS316L stainless steel to improve corrosion resistance, and redundant temperature control modules are added to the control system.

Maintenance innovation: implement a dynamic maintenance plan based on operating hours, and establish an annual refrigerant purity testing system。

The solutions to these problems need to be analyzed in combination with the specific model of the equipment, the use environment and the maintenance history. It is recommended to establish a collaborative maintenance mechanism including the OEM of the equipment, third-party testing institutions and user technical teams. For key test items, it is recommended to configure a dual-machine hot standby system to ensure the continuity of testing.

 